ARCHITECTURAL ASBUILT SCANNING
Complete survey for more than 60 branches across the Kingdom with interior details including showroom, warehouse, rooms, furniture, equipment,
Complete survey for more than 60 branches across the Kingdom with interior details including showroom, warehouse, rooms, furniture, equipment,
Survey Construction Works: -Carrying out traverse for B.M for all the site. -Make asbuilt for all the site. -Drawing
Asbuilt for Patchi store in Jeddah In addition to complete internal building details including Walls, Columns, stairs, Elevators, Ceilings,
install control point using GPS (Global Positioning SYSTEM) for Waste Segragation project
From the company’s businesses (Survey & Finishing & Rebuilding). Carrying out all survey works for interior final finishing operations
From the company’s businesses (Survey & Finishing) Carrying out all survey works for the site . Starting from :
Carrying out all survey works for the site, including fix site boundaries, concrete works, foundation, columns, walls, ceiling ….
From the company’s businesses (Survey & Finishing) Carrying out all survey works for the site . Starting from :
Carrying out all survey works for the site . Starting from : scanning the building’s interior details, including :
Carrying out of landscap works: *Mechanical and Electrical works: Fix all points for lighting, duct, fire, smoke damper and
Carrying out all survey works for interior final finishing operations works: Starting from: – Make as-built plans for the
Carrying out all survey works for Construction and interior final finishing operations Starting from: -Install for B.M for all
Carrying out all survey works for Construction and interior final finishing operations Starting from: -Install for B.M for all
Carrying out all survey works for interior final finishing operations work: Starting from: – Make architectural as-built for six
Fix all facades details (glass and marble) Fix all ceiling details including electrical and mechanical points (lighting, duct, fire,
PATHOLOGY&MEDICAL LABORATORY BUILDING PHASE 1(ON GOING) Carrying out all survey works for construction and interior final finishing operations. Construction
PATHOLOGY&MEDICAL LABORATORY BUILDING PHASE 2 interior final finishing operations works: Carrying out all survey works for the site, including
Carrying out all survey works for construction and interior final finishing operations for two building. Construction works: -Carrying out
interior final finishing operations works (not limited to): -Fix all partitions location. -Fix all ceilling gypsum board details. -Fix
Carrying out all survey works for construction and interior final finishing operations for the project. Starting from: -Install for
scanning the building’s interior details, including : Walls, columns, stairs, floors, doors, windows and ceiling details. using 3D Laser
Do asbuilt and design for 3 KM road in Waste Segragation station